HUNTINGTON INGALLS INCORPORATED vs THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

Side-by-side federal contract comparison

Full history (FY2020-2023) available with Pro

Free comparisons show FY2024-2026. Upgrade for the full 7-year history.

Upgrade

Key Metrics

MetricHUNTINGTON INGALLS INCORPOR...THE REGENTS OF THE UNIVERSI...
Total Obligations$50.9B$54.8B
Contracts899
Agencies25
HHI Score8374HIGH9931HIGH
Top Agency Concentration91.1%Department of Defense99.7%Department of Energy
Upcoming Cliffs5$3.8B at risk3$190.3M at risk

Spend Trend

CompanyFY2024FY2025
HUNTINGTON INGALLS INC...$695.2M$134.6M
THE REGENTS OF THE UNI...$39K$30K

Agency Mix

HUNTINGTON INGALLS INCORPORATED

THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

NAICS Breakdown

HUNTINGTON INGALLS INCORPORATED

CodeDescriptionValue

THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

CodeDescriptionValue

Upcoming Contract Cliffs

HUNTINGTON INGALLS INCORPORATED

ContractAt RiskExp
THIS MODIFICATION IS ISSUED FOR ADMINISTRATIVE PURPOSES TO FACILITATE CONTINUED CONTRACT PERFORMANCE DUE TO LIMITED AVAILABILITY OF ACRNS ON CONTRACT N00024-21-C-4205. THIS MODIFICATION IS AUTHORIZED IN ACCORDANCE WITH FAR 4.1601 AND DFARS 204.1601$53.5M3mo
DETAIL DESIGN AND CONSTRUCTION (DD&C) FOR LHA 8 (INITIAL EFFORT LIMITED TO PLANNING, ADVANCED ENGINEERING AND PROCUREMENT OF LONG LEAD TIME MATERIAL)$3.2B5mo
SHIP ALTERATION WORK$160.6M7mo
LPD 17 CLASS ENGINEERING SERVICES$113.8M11mo
DDG 1002 SHORE SUPPORT$298.6M13mo

THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

ContractAt RiskExp
ANNUAL CHEMICAL INVENTORY MANAGEMENT FOR SUBSCRIPTION SERVICES TO THE RISK & SAFETY SOLUTIONS (RSS) PLATFORM AS DESCRIBED IN THE STATEMENT OF WORK. THIS REQUIREMENT INCLUDES A BASE YEAR WITH TWO OPTION YEAR PERIODS.$30K3mo
HAZARDOUS CHEMICAL INVENTORY AND SDS SOFTWARE ANNUAL SUBSCRIPTION ONE-YEAR BASE PERIOD WITH 4 ONE-YEAR RENEWAL OPTIONS$39K5mo
TIME HISTORY OF EVENTS&MACROSCALE INTERACTIONS DURING SUBSTORMS (THEMIS) MISSION PHASE A EFFORT THE CONTRACTOR SHALL PROVIDE A CONCEPT STUDY FOR THE THEMIS MISSION IN ORDER TO PROVIDE NASA WITH MORE DEFINITIVE INFORMATION REGARDING THE COST, RISK, AND FEASIBILITY OF THE INVESTIGATION. THE CONTRACTOR SHALL PREPARE AND DELIVER A CONCEPT STUDY REPORT DETAILING THE RESULTS OF THE STUDY IN ACCORDANCE WITH ATTACHMENT B OF THE CONTRACT ENTITLED "MEDIUM-CLASS EXPLORER PROGRAM GUIDELINES AND CRITERIA FOR THE PHASE A CONCEPT STUDY". THE CONTRACTOR SHALL ALSO SUPPORT A NASA SITE VISIT AT ITS FACILITY TO DISCUSS THE CONCEPT STUDY REPORT AND ATTEND A PHASE A CONCEPT STUDY REVIEW MEETING, BRIDGE PHASE OPTION: THE CONTRACTOR SHALL COMMENCE INITIAL DEFINITION PHASE ACTIVITIES, INCLUDING LONG LEAD PARTS PROCUREMENTS. AND THE FOLLOWING ACTIVITIES: - PROVIDE PROGRAM MANAGEMENT FOR THEMIS; - BEGIN SCIENTIFIC STUDIES AND SIMULATIONS TO PROVIDE SCIENTIFIC INPUT FOR INSTRUMENT AND ORBIT DESIGN ENSURING THEY MEET SCIENCE GOALS; - BEGIN THE DESIGN AND DEVELOPMENT AND INSTRUMENTS, OTHER HARDWARE, AND ELECTRONICS; AND - BEGIN FLIGHT SOFTWARE DEVELOPMENT$190.2M31mo

Want to compare different contractors?

Open Compare Tool