CALIFORNIA INSTITUTE OF TECHNOLOGY vs HUNTINGTON INGALLS INCORPORATED
Side-by-side federal contract comparison
Full history (FY2020-2023) available with Pro
Free comparisons show FY2024-2026. Upgrade for the full 7-year history.
Key Metrics
| Metric | CALIFORNIA INSTITUTE OF TEC... | HUNTINGTON INGALLS INCORPOR... |
|---|---|---|
| Total Obligations | $40.8B | $50.9B |
| Contracts | 1,673 | 89 |
| Agencies | 2 | 2 |
| HHI Score | 10000HIGH | 8374HIGH |
| Top Agency Concentration | 100.0%National Aeronautics and Space Administration | 91.1%Department of Defense |
| Upcoming Cliffs | 5$11.3M at risk | 5$3.8B at risk |
Spend Trend
| Company | FY2024 | FY2025 | FY2026 |
|---|---|---|---|
| CALIFORNIA INSTITUTE O... | $87.7M | $88.7M | $2.5M |
| HUNTINGTON INGALLS INC... | $695.2M | $134.6M | -- |
Agency Mix
CALIFORNIA INSTITUTE OF TECHNOLOGY
| Agency | Share |
|---|---|
| National Aeronautics and Sp... | 10% |
| Department of Health and Hu... | 0% |
HUNTINGTON INGALLS INCORPORATED
| Agency | Share |
|---|---|
| Department of Defense | 18% |
| Department of Homeland Secu... | 0% |
NAICS Breakdown
CALIFORNIA INSTITUTE OF TECHNOLOGY
| Code | Description | Value |
|---|
HUNTINGTON INGALLS INCORPORATED
| Code | Description | Value |
|---|
Upcoming Contract Cliffs
CALIFORNIA INSTITUTE OF TECHNOLOGY
| Contract | At Risk | Exp |
|---|---|---|
| ODYSEA (OCEAN DYNAMICS AND SURFACE EXCHANGE WITH THE ATMOSPHERE) (83-223395) | $4.3M | 0mo |
| THE CARBON INVESTIGATION: CARBON-I (83-223400) | $3.3M | 0mo |
| AUTONOMOUS GROUND VEHICLE TECHNOLOGY DEVELOPMENT FOR US ARMY (81-110695) | $3.3M | 0mo |
| ADVANCING POSITIONING, NAVIGATION AND TIMING TECHNOLOGIES (82-111154) | $287K | 0mo |
| JPL SUPPORT TO NASA STUDY TEAM FOR KASA-LED L4 MISSION (71-229710) | $85K | 0mo |
HUNTINGTON INGALLS INCORPORATED
| Contract | At Risk | Exp |
|---|---|---|
| THIS MODIFICATION IS ISSUED FOR ADMINISTRATIVE PURPOSES TO FACILITATE CONTINUED CONTRACT PERFORMANCE DUE TO LIMITED AVAILABILITY OF ACRNS ON CONTRACT N00024-21-C-4205. THIS MODIFICATION IS AUTHORIZED IN ACCORDANCE WITH FAR 4.1601 AND DFARS 204.1601 | $53.5M | 3mo |
| DETAIL DESIGN AND CONSTRUCTION (DD&C) FOR LHA 8 (INITIAL EFFORT LIMITED TO PLANNING, ADVANCED ENGINEERING AND PROCUREMENT OF LONG LEAD TIME MATERIAL) | $3.2B | 5mo |
| SHIP ALTERATION WORK | $160.6M | 7mo |
| LPD 17 CLASS ENGINEERING SERVICES | $113.8M | 11mo |
| DDG 1002 SHORE SUPPORT | $298.6M | 13mo |
Want to compare different contractors?
Open Compare Tool