Federal Agency
National Aeronautics and Space Administration
NASA · Code: 080
Total tracked spending: $41.8B
Spending Trend
$14.9BFY2020
$7.9BFY2021
$7.1BFY2022
$6.4BFY2023
$3.1BFY2024
$2.1BFY2025
$308.4MFY2026
Top Contractors
Top NAICS Categories
| Code | Description | Obligations | Contracts |
|---|---|---|---|
| 336414 | GUIDED MISSILE AND SPACE VEHICLE MANUFACTURING | $58.3B | 209 |
| 541710 | RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES | $44.0B | 548 |
| 541712 | RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY) | $43.8B | 2070 |
| 541715 | RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY) | $38.4B | 6521 |
| 481212 | NONSCHEDULED CHARTERED FREIGHT AIR TRANSPORTATION | $19.3B | 213 |
| 541330 | ENGINEERING SERVICES | $18.4B | 2201 |
| 561210 | FACILITIES SUPPORT SERVICES | $10.2B | 577 |
| 541512 | COMPUTER SYSTEMS DESIGN SERVICES | $7.0B | 423 |
| 336415 | GUIDED MISSILE AND SPACE VEHICLE PROPULSION UNIT AND PROPULSION UNIT PARTS MANUFACTURING | $6.7B | 34 |
| 517919 | ALL OTHER TELECOMMUNICATIONS | $3.9B | 19 |
| 334511 | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING | $3.6B | 196 |
| 333314 | OPTICAL INSTRUMENT AND LENS MANUFACTURING | $2.8B | 143 |
| 541990 | ALL OTHER PROFESSIONAL, SCIENTIFIC, AND TECHNICAL SERVICES | $2.8B | 802 |
| 236210 | INDUSTRIAL BUILDING CONSTRUCTION | $2.5B | 152 |
| 541519 | OTHER COMPUTER RELATED SERVICES | $2.3B | 7021 |
Contract Type Mix
| Pricing Type | Obligations | Contracts | Share |
|---|---|---|---|
| COST PLUS AWARD FEE | $138.9B | 536 | 332.5% |
| FIRM FIXED PRICE | $65.2B | 34581 | 156.0% |
| COST PLUS FIXED FEE | $62.7B | 4192 | 150.1% |
| COST PLUS INCENTIVE FEE | $12.2B | 45 | 29.2% |
| COST NO FEE | $7.5B | 308 | 18.1% |
| FIXED PRICE INCENTIVE | $2.1B | 3 | 5.0% |
| TIME AND MATERIALS | $637.8M | 300 | 1.5% |
| ORDER DEPENDENT (IDV ALLOWS PRICING ARRANGEMENT TO BE DETERMINED SEPARATELY FOR EACH ORDER) | $448.9M | 247 | 1.1% |
| FIXED PRICE AWARD FEE | $199.0M | 26 | 0.5% |
| FIXED PRICE LEVEL OF EFFORT | $186.0M | 7 | 0.4% |
| COST SHARING | $173.4M | 23 | 0.4% |
| FIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT | $102.9M | 83 | 0.2% |
| COMBINATION (APPLIES TO AWARDS WHERE TWO OR MORE OF THE ABOVE APPLY) | $95.2M | 2 | 0.2% |
| LABOR HOURS | $16.8M | 13 | 0.0% |
| Unknown | $901K | 2 | 0.0% |
| OTHER (APPLIES TO AWARDS WHERE NONE OF THE ABOVE APPLY) | $434K | 1 | 0.0% |