LOCKHEED MARTIN CORP vs THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

Side-by-side federal contract comparison

Full history (FY2020-2023) available with Pro

Free comparisons show FY2024-2026. Upgrade for the full 7-year history.

Upgrade

Key Metrics

MetricLOCKHEED MARTIN CORPTHE REGENTS OF THE UNIVERSI...
Total Obligations$79.7B$54.8B
Contracts989
Agencies35
HHI Score4520HIGH9931HIGH
Top Agency Concentration60.3%Department of Energy99.7%Department of Energy
Upcoming Cliffs5$72.7M at risk3$190.3M at risk

Spend Trend

CompanyFY2024FY2025FY2026
LOCKHEED MARTIN CORP$198.8M$158.6M$320K
THE REGENTS OF THE UNI...$39K$30K--

Agency Mix

LOCKHEED MARTIN CORP

THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

NAICS Breakdown

LOCKHEED MARTIN CORP

CodeDescriptionValue

THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

CodeDescriptionValue

Upcoming Contract Cliffs

LOCKHEED MARTIN CORP

ContractAt RiskExp
SPACECRAFT PROCESSOR UNIT ENVIRONMENT$8.8M0mo
ADVANCED EXTREMELY HIGH FREQUENCY CAPABILITY EVOLUTION PHASE II$62.0M1mo
THE PURPOSE OF THIS REQUIREMENT IS TO PROVIDE SUPPORT TO THE SYSTEM WHILE IT IS TRANSITIONING TO OPERATIONS.$741K1mo
THE PURPOSE OF THIS REQUIREMENT IS TO PROVIDE SUPPORT TO THE SYSTEM WHILE IT IS TRANSITIONING TO OPERATIONS.$741K1mo
ON-ORBIT SUPPORT, BACK-SHOP RESIDUAL SUPPORT$476K3mo

THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

ContractAt RiskExp
ANNUAL CHEMICAL INVENTORY MANAGEMENT FOR SUBSCRIPTION SERVICES TO THE RISK & SAFETY SOLUTIONS (RSS) PLATFORM AS DESCRIBED IN THE STATEMENT OF WORK. THIS REQUIREMENT INCLUDES A BASE YEAR WITH TWO OPTION YEAR PERIODS.$30K3mo
HAZARDOUS CHEMICAL INVENTORY AND SDS SOFTWARE ANNUAL SUBSCRIPTION ONE-YEAR BASE PERIOD WITH 4 ONE-YEAR RENEWAL OPTIONS$39K5mo
TIME HISTORY OF EVENTS&MACROSCALE INTERACTIONS DURING SUBSTORMS (THEMIS) MISSION PHASE A EFFORT THE CONTRACTOR SHALL PROVIDE A CONCEPT STUDY FOR THE THEMIS MISSION IN ORDER TO PROVIDE NASA WITH MORE DEFINITIVE INFORMATION REGARDING THE COST, RISK, AND FEASIBILITY OF THE INVESTIGATION. THE CONTRACTOR SHALL PREPARE AND DELIVER A CONCEPT STUDY REPORT DETAILING THE RESULTS OF THE STUDY IN ACCORDANCE WITH ATTACHMENT B OF THE CONTRACT ENTITLED "MEDIUM-CLASS EXPLORER PROGRAM GUIDELINES AND CRITERIA FOR THE PHASE A CONCEPT STUDY". THE CONTRACTOR SHALL ALSO SUPPORT A NASA SITE VISIT AT ITS FACILITY TO DISCUSS THE CONCEPT STUDY REPORT AND ATTEND A PHASE A CONCEPT STUDY REVIEW MEETING, BRIDGE PHASE OPTION: THE CONTRACTOR SHALL COMMENCE INITIAL DEFINITION PHASE ACTIVITIES, INCLUDING LONG LEAD PARTS PROCUREMENTS. AND THE FOLLOWING ACTIVITIES: - PROVIDE PROGRAM MANAGEMENT FOR THEMIS; - BEGIN SCIENTIFIC STUDIES AND SIMULATIONS TO PROVIDE SCIENTIFIC INPUT FOR INSTRUMENT AND ORBIT DESIGN ENSURING THEY MEET SCIENCE GOALS; - BEGIN THE DESIGN AND DEVELOPMENT AND INSTRUMENTS, OTHER HARDWARE, AND ELECTRONICS; AND - BEGIN FLIGHT SOFTWARE DEVELOPMENT$190.2M31mo

Want to compare different contractors?

Open Compare Tool