SIKORSKY AIRCRAFT CORPORATION vs THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

Side-by-side federal contract comparison

Full history (FY2020-2023) available with Pro

Free comparisons show FY2024-2026. Upgrade for the full 7-year history.

Upgrade

Key Metrics

MetricSIKORSKY AIRCRAFT CORPORATIONTHE REGENTS OF THE UNIVERSI...
Total Obligations$54.5B$54.8B
Contracts167,2269
Agencies55
HHI Score9770HIGH9931HIGH
Top Agency Concentration98.8%Department of Defense99.7%Department of Energy
Upcoming Cliffs5$66.2M at risk3$190.3M at risk

Spend Trend

CompanyFY2024FY2025FY2026
SIKORSKY AIRCRAFT CORP...$1.9B$758.8M$34.5M
THE REGENTS OF THE UNI...$39K$30K--

Agency Mix

NAICS Breakdown

SIKORSKY AIRCRAFT CORPORATION

CodeDescriptionValue

THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

CodeDescriptionValue

Upcoming Contract Cliffs

SIKORSKY AIRCRAFT CORPORATION

ContractAt RiskExp
GEARBOX ASSEMBLY,AI$49.2M0mo
DRIVE UNIT,ANGLE$11.5M0mo
DELIVERY ORDER FOR THE PROCUREMENT OF 150 EACH OF THE REMOVABLE STACK ASSEMBLY.$2.0M0mo
COMPUTER SYSTEM,DIG$1.8M0mo
8511231337!PANEL,STRUCTURAL,AI$1.7M0mo

THE REGENTS OF THE UNIVERSITY OF CALIFORNIA

ContractAt RiskExp
ANNUAL CHEMICAL INVENTORY MANAGEMENT FOR SUBSCRIPTION SERVICES TO THE RISK & SAFETY SOLUTIONS (RSS) PLATFORM AS DESCRIBED IN THE STATEMENT OF WORK. THIS REQUIREMENT INCLUDES A BASE YEAR WITH TWO OPTION YEAR PERIODS.$30K3mo
HAZARDOUS CHEMICAL INVENTORY AND SDS SOFTWARE ANNUAL SUBSCRIPTION ONE-YEAR BASE PERIOD WITH 4 ONE-YEAR RENEWAL OPTIONS$39K5mo
TIME HISTORY OF EVENTS&MACROSCALE INTERACTIONS DURING SUBSTORMS (THEMIS) MISSION PHASE A EFFORT THE CONTRACTOR SHALL PROVIDE A CONCEPT STUDY FOR THE THEMIS MISSION IN ORDER TO PROVIDE NASA WITH MORE DEFINITIVE INFORMATION REGARDING THE COST, RISK, AND FEASIBILITY OF THE INVESTIGATION. THE CONTRACTOR SHALL PREPARE AND DELIVER A CONCEPT STUDY REPORT DETAILING THE RESULTS OF THE STUDY IN ACCORDANCE WITH ATTACHMENT B OF THE CONTRACT ENTITLED "MEDIUM-CLASS EXPLORER PROGRAM GUIDELINES AND CRITERIA FOR THE PHASE A CONCEPT STUDY". THE CONTRACTOR SHALL ALSO SUPPORT A NASA SITE VISIT AT ITS FACILITY TO DISCUSS THE CONCEPT STUDY REPORT AND ATTEND A PHASE A CONCEPT STUDY REVIEW MEETING, BRIDGE PHASE OPTION: THE CONTRACTOR SHALL COMMENCE INITIAL DEFINITION PHASE ACTIVITIES, INCLUDING LONG LEAD PARTS PROCUREMENTS. AND THE FOLLOWING ACTIVITIES: - PROVIDE PROGRAM MANAGEMENT FOR THEMIS; - BEGIN SCIENTIFIC STUDIES AND SIMULATIONS TO PROVIDE SCIENTIFIC INPUT FOR INSTRUMENT AND ORBIT DESIGN ENSURING THEY MEET SCIENCE GOALS; - BEGIN THE DESIGN AND DEVELOPMENT AND INSTRUMENTS, OTHER HARDWARE, AND ELECTRONICS; AND - BEGIN FLIGHT SOFTWARE DEVELOPMENT$190.2M31mo

Want to compare different contractors?

Open Compare Tool